Stabilisation

Soil Stabilisation – Reclamation

Many sites demand more than conventional cut/fill to achieve an effective earthworks solution. We offer a complete design and construction service for all site remediation and earthworks. Poor quality soils and ground contamination require a range of engineering methods in order to achieve satisfactory solutions which are the most cost effective for new and Brownfield sites. RJT Excavations work in conjunction with experienced Consulting Engineers, who are acknowledged as Environmental and Geotechnical specialists to provide and underwrite a wide range of remediation solutions, acceptable to the NHBC and Planning Departments. Our engineering partners cover all of our work with them under their Professional Indemnity Insurance.

RJT has successfully completed many remediation contracts providing ground platforms for commercial industrial and residential sites. Our accreditations include ISO 9001, 18001 and 14001 which ensures that all quality, health and safety and environmental aspects are fully considered and correctly managed.

Surface Water, Site Waste Management and Traffic Movement plans are put in place and RJT are fully capable of undertaking the responsibilities required of Principal Contractor.

Soil Stabilisation

Soil Stabilisation using cement and lime has been used for century’s to stabilise unsuitable soils and to improve their engineering properties. It is a technique RJT have successfully employed on many occasions.

Unsuitable materials can be treated insitu, reducing disposal to landfill, with savings on the need to import suitable fill or road stone using site stabilised materials.

The procedure is simple and following examination of the geotechnical reports for any project, or when necessary conducting preliminary testing, an accurate evaluation is made of the treatments we will propose. From experience we assess the viability of the available options and identify opportunities to reduce costs, and improve site conditions at an early stage.

Materials can be stabilised with the addition of lime, cement or other specialist binders to achieve a product to an agreed specification or we will design a mix to suit the performance characteristics required. Our work is then achieved, monitored, and tested against the specification as work proceeds.

Our specialised integrated stabilisation equipment adds binders and water precisely and at the same rotovates them into the unsuitable ground. Our equipment achieves an even distribution through the mix and minimizes losses through wind blow or evaporation whilst the rotovaters pulverising action further conditions the materials to achieve a consistent quality product.

Case Studies

Below are a sample of case studies, to view more please visit the case study section of the website. You will need Adobe Acrobat reader to view the case studies, click here to download

intro_divider

Raynesway Construction Ltd

button_downloadRJT were contracted to undertake the earthworks to form a 9,500m2 car park to service an existing NHS training facility.

divider_line

Shrubhill Development Remediation

button_download

Remediation and reduced level excavation.

divider_line

Starlaw Park

button_downloadThe contract was awarded for a bottling facility and bonded warehouse development consisting of eventually 22 units.

divider_line

Western Harbour

button_downloadThe reclamation of part of the existing Western Harbour, Leith to form land for residential and commercial buildings.

divider_line

Kingston Dock

button_downloadRemoval of hardstanding and underground obstructions, Infilling of three 31 to 38m diameter, 6m deep gas holders…
divider_line

Kingston Phase 2 Enabling Works

button_downloadThe contract entailed demolition and infilling of an existing wet dock along with works associated with the remediation of a disused gasworks…
divider_line

Bonnyrigg

button_downloadThe contract entailed construction of a 10,000m2 building platform for the construction of a new community hospital…

divider_line

Todhills

Cement stabilised concrete slab for use as a waste handling facilitybutton_download

divider_line

Tesco, Llandrindod Wells

button_download

Tesco Llandrindod Wells is a new Tesco store on an old MOD site with car parking and petrol station

divider_line

Whitelands Farm, Bicester

button_download

This contact is to provide all the infrastructure for a new housing and leisure development

divider_line

Mogden Lane Sewage Works, Twickenham

button_download

RJT Excavations provided a lime stabilising solution  for a high durable piling platform with environmental considerations at the forefront

divider_line

Carlisle Bypass

button_downloadRJT were employed to carryout the bulk earthworks, lime modification, soil stabilised capping layers and produce a cement stabilised core embankment

divider_line

Edinburgh Royal Infirmary

button_downloadRJT were employed to carry out lime stabilisation works to form a new car park on an existing flood plain.