Case Study Stabilisation

You will need Adobe Acrobat reader to view the case studies, click here to download

intro_divider

Raynesway Construction Ltd

button_downloadRJT were contracted to undertake the earthworks to form a 9,500m2 car park to service an existing NHS training facility.

divider_line

Shrubhill Development Remediation

button_download

Remediation and reduced level excavation.

divider_line

Starlaw Park

button_downloadThe contract was awarded for a bottling facility and bonded warehouse development consisting of eventually 22 units.

divider_line

Western Harbour

button_downloadThe reclamation of part of the existing Western Harbour, Leith to form land for residential and commercial buildings.

divider_line

Kingston Dock

button_downloadRemoval of hardstanding and underground obstructions, Infilling of three 31 to 38m diameter, 6m deep gas holders…
divider_line

Kingston Phase 2 Enabling Works

button_downloadThe contract entailed demolition and infilling of an existing wet dock along with works associated with the remediation of a disused gasworks…
divider_line

Bonnyrigg

button_downloadThe contract entailed construction of a 10,000m2 building platform for the construction of a new community hospital…

divider_line

Todhills

Cement stabilised concrete slab for use as a waste handling facilitybutton_download

divider_line

Tesco, Llandrindod Wells

button_download

Tesco Llandrindod Wells is a new Tesco store on an old MOD site with car parking and petrol station

divider_line

Whitelands Farm, Bicester

button_download

This contact is to provide all the infrastructure for a new housing and leisure development

divider_line

Mogden Lane Sewage Works, Twickenham

button_download

RJT Excavations provided a lime stabilising solution  for a high durable piling platform with environmental considerations at the forefront

divider_line

Carlisle Bypass

button_downloadRJT were employed to carryout the bulk earthworks, lime modification, soil stabilised capping layers and produce a cement stabilised core embankment

divider_line

Edinburgh Royal Infirmary

button_downloadRJT were employed to carry out lime stabilisation works to form a new car park on an existing flood plain.