Case Study Earthworks

You will need Adobe Acrobat reader to view the case studies, click here to download

intro_divider

Starlaw Park

button_downloadThe contract was awarded for a bottling facility and bonded warehouse development consisting of eventually 22 units…

divider_line

Low Valleyfield, Fife, Scotland

button_downloadValleyfield Ash Lagoons are a disposal facility used by Longannet power station for dealing with the by product (PFA) from coal burning electricity generation…

divider_line

Western Harbour

button_downloadThe reclamation of part of the existing Western Harbour, Leith to form land for residential and commercial buildings…

divider_line

Project Poniel Phase 2, Junction 11 M74

button_downloadThe contract is for the second phase advanced earthworks for a bonded warehouse development consisting of eventually 18 units..

divider_line

A7 Langholm, Scottish Borders

button_download

The A7 Auchenrivock improvement is a 2.7km length of new build road construction, replacing an existing stretch of the A7 in the Scottish Borders…

divider_line

Tesco, Llandrindod Wells

button_download

Tesco Llandrindod Wells is a new Tesco store on an old MOD site with car parking and petrol station

divider_line

Whitelands Farm, Bicester

button_download

This contact is to provide all the infrastructure for a new housing and leisure development

divider_line

Tesco, Amesbury

button_download

Tesco Amesbury is a new Tesco store with roads, car parking and petrol station

divider_line

Black Devon, Alloa

button_download

The works consisted of the capping of a landfill site with materials recovered from the formation of a wetland area for birds

divider_line

 Braes of Doune Windfarm

button_downloadThe works consisted of upgrading and new construction of 25,000 m of access roads for wind turbine erection

divider_line

Coalburn Substation, Lanarkshire

button_downloadThe construction of an embankment for a 650m access road along with the formation of a 40,000m2 platform for the installation of 400KV sub-station

divider_line

Crystal Rigg Windfarm, East Lothian

button_downloadThe construction of access tracks and a 24,000m2 platform for the installation of 400KV sub-station

divider_line

Carlisle Bypass

button_downloadRJT were employed to carryout the bulk earthworks, lime modification, soil stabilised capping layers and produce a cement stabilised core embankment

divider_line

Quartermile Q6, Edinburgh

button_downloadThe contract involved basement reduced level excavations for Edinburgh city centre office and retail premises. Management of offside soils, contaminants and traffic control was also a major feature of the work provided.

divider_line

Leith Street, Edinburgh

button_downloadThe contract involved excavation and disposal off site of  soils, temporary support systems and interface with the public

divider_line

EICC, Edinburgh

button_downloadThe contract involved basement reduced excavations for Edinburgh International Conference Centre and managing soil and material deliveries on and off site.

divider_line

Quartermile Q20, Edinburgh

button_downloadThe contract involved excavation and disposal off site of inert soils, WAC testing and installation of gabion basket temporary supports

divider_line

Denny – Beauly Powerline, Crieff

button_downloadThe contract involved the installation, maintenance and removal of 50km of temprary stone tracks to facilitate the erection of 80 new electricity transmission pylons

divider_line

College Lands, Glasgow

button_downloadThe contract involved excavation and preparation of old railway station for a £200m development for residential / offices and car park