Case Study Civil Engineering & Groundworks

divider_line

Carlisle Bypass

button_downloadRJT were employed to carryout the bulk earthworks, lime modification, soil stabilised capping layers and produce a cement stabilised core embankment

divider_line

Heritage Walk Sea Defence, Walton on the Naze

button_downloadThis contract is a to provide a sea defence 110m long and 15m wide to protect the ancient monument the Naze Tower (built in 1720)from further cliff erosion and provide a public walkway to the beach

divider_line

Kingston Docks, Greenock

button_downloadThe contract entailed demolition and infilling of an existing wet dock along with works associated with the remediation of a disused gasworks for housing on a site covering an area of 12.5 Ha

divider_line

Quartermile Q6, Edinburgh

button_downloadThe contract involved basement reduced level excavations for Edinburgh city centre office and retail premises. Management of offside soils, contaminants and traffic control was also a major feature of the work provided.

divider_line

Leith Street, Edinburgh

button_downloadThe contract involved excavation and disposal off site of  soils, temporary support systems and interface with the public

divider_line

EICC, Edinburgh

button_downloadThe contract involved basement reduced excavations for Edinburgh International Conference Centre and managing soil and material deliveries on and off site.

divider_line

Quartermile Q20, Edinburgh

button_downloadThe contract involved excavation and disposal off site of inert soils, WAC testing and installation of gabion basket temporary supports

divider_line

College Lands, Glasgow

button_downloadThe contract involved excavation and preparation of old railway station for a £200m development for residential / offices and car park