Case Study Civil Engineering & Groundworks

Carlisle Bypass
RJT were employed to carryout the bulk earthworks, lime modification, soil stabilised capping layers and produce a cement stabilised core embankment

Heritage Walk Sea Defence, Walton on the Naze
This contract is a to provide a sea defence 110m long and 15m wide to protect the ancient monument the Naze Tower (built in 1720)from further cliff erosion and provide a public walkway to the beach

Kingston Docks, Greenock
The contract entailed demolition and infilling of an existing wet dock along with works associated with the remediation of a disused gasworks for housing on a site covering an area of 12.5 Ha
Quartermile Q6, Edinburgh
The contract involved basement reduced level excavations for Edinburgh city centre office and retail premises. Management of offside soils, contaminants and traffic control was also a major feature of the work provided.
Leith Street, Edinburgh
The contract involved excavation and disposal off site of soils, temporary support systems and interface with the public
EICC, Edinburgh
The contract involved basement reduced excavations for Edinburgh International Conference Centre and managing soil and material deliveries on and off site.
Quartermile Q20, Edinburgh
The contract involved excavation and disposal off site of inert soils, WAC testing and installation of gabion basket temporary supports

College Lands, Glasgow
The contract involved excavation and preparation of old railway station for a £200m development for residential / offices and car park
